1. Home
  2. Functions
  3. Date and time
  4. WORKDAY.INTL

WORKDAY.INTL function

Returns the date a number of working days before or after a date, with a choice of weekend days and holidays.

Syntax

=WORKDAY.INTL(start_date, days, [weekend], [holidays])

Arguments

ArgumentRequiredDescription
start_dateRequiredThe starting date
daysRequiredWorking days to add (negative to go back)
weekendOptionalA weekend number (1 to 7, 11 to 17) or a 7 character mask like "0000011" starting on Monday
holidaysOptionalOptional dates to skip

How to use WORKDAY.INTL

WORKDAY.INTL takes 2 required arguments and 2 optional arguments. Type =WORKDAY.INTL( in a cell and SheetsBat shows the arguments as you go. Optional arguments are shown in square brackets; leave them out to use their default.

Examples

Each result below was calculated by the SheetsBat formula engine.

=WORKDAY.INTL(DATE(2012,1,1), 30, 0)Result #NUM!
=WORKDAY.INTL(DATE(2012,1,1), 90, 11)Result 41013, shown as 4/14/2012 with a date format
=WORKDAY.INTL(DATE(2012,1,1), 30, 17)Result 40944, shown as 2/5/2012 with a date format

Every formula, right in your browser

SheetsBat calculates 536 functions, with charts, pivot tables and live collaboration. Free to start.