1. Home
  2. Functions
  3. Date and time
  4. WORKDAY

WORKDAY function

Returns the date a number of working days (Monday to Friday) before or after a date, skipping holidays.

Syntax

=WORKDAY(start_date, days, [holidays])

Arguments

ArgumentRequiredDescription
start_dateRequiredThe starting date
daysRequiredWorking days to add (negative to go back)
holidaysOptionalOptional dates to skip

How to use WORKDAY

WORKDAY takes 2 required arguments and 1 optional argument. Type =WORKDAY( in a cell and SheetsBat shows the arguments as you go. Optional arguments are shown in square brackets; leave them out to use their default.

Examples

Each result below was calculated by the SheetsBat formula engine.

=WORKDAY(DATE(2008,10,1), 151)Result 39933, shown as 4/30/2009 with a date format
=WORKDAY(DATE(2008,10,1), 151, A1:A3)Result 39938, shown as 5/5/2009 with a date format
Data in the sheet
A
139778
239786
339834

Every formula, right in your browser

SheetsBat calculates 536 functions, with charts, pivot tables and live collaboration. Free to start.